Customization: | Available |
---|---|
Application: | Diode, Detection |
Batch Number: | 2023+ |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
B,Specification
Parameter |
Symbol |
Min |
Typ |
Max |
Unit |
Optical power from pigtail |
Pf |
|
400 |
|
mW |
Wavelength |
lc |
375 |
380 |
385 |
nm |
Wavelength v/s temperature coefficient |
dl/dT |
|
0.1 |
|
nm/oC |
Spectral linewidth (FWHM) |
Dl |
|
25 |
|
nm |
Forward current |
If |
|
600 |
800 |
mA |
Threshold current |
Ith |
|
200 |
|
mA |
Forward voltage |
Vf |
|
3.2 |
4 |
V |
Effency |
|
90 |
|
|
% |
Operating temperature (heatsink temperature) |
Top |
-10 |
|
70 |
oC |
Storage temperature |
Tstg |
-40 |
|
70 |
oC |
LD reverse voltage |
VrLD |
|
|
2 |
V |
PD current |
Ipd |
0.03 |
|
|
mA |
Lead soldering temperature @ 10s | - | 260 | oC |
Our factry
Why you choose Greenergy
1,Partners in the Workplace,A list of outstanding organizations we have teamed with to help building a successful quality controlling program.
2,Our UV LED Bulb are sold to reseller professionals in over 50 countries worldwide for years.
3,All of our UV LED Bulb made fresh within one month of your order, and has a two year warranty.
4, UV LED Bulb in the China in accordance to strict industry regulations.
5,All of UV LED Bulb are subject to continuous laboratory quality testing.
6,We offer top quality light fixtures for prices well below the market standard.
Quality Control:
In order to continuously enhance the quality of management and meet customers' needs, we have passed through the ISO9001 quality management system certification
fixtures modern are produced through standard procedures conducted by trained staffs.
100% of the led light fixtures will be tested and keep lighting for 24 hours to test its quality reliability , and we will also test its temperature after 24 hours lighting.
Then after it is cool we again test 100% of the lamps to see if it still work well . Each led Cabinet light should pass all these QC procedures before the packing.
Trade Terms:
1. Payment term: T/T, L/C ,Western Union,Paypal
2. Lead time : normally in 5~10 days after confirmation .
3. Sample policy : Samples are always availble for each model,though it will be charged.
4. Shipping port: Changsha , China
Delivery detail:
Carrier is available by express,or sea shippiung or ordinary air cargo,
Our services:
1. we will reply you in detail within 24 hours
2. We own well-tranied and passional sales & after- sale services who can speak fluent Engligh language
3. We offer OEM services. Can print your own logo on product , can customize the retail box packing and other things.
4. We have very experienced R&D engineers and we have strong ability to do ODM projects.
Quality is guaranteed by professional team of R&D and QC.
About Us
The Leader of UV LED in China, Greenergy Lighting enanganed in LED for years, covers around 1000 square meters in Changsha China. We focus on providing environment-friendly but energy saving LED solutions to our people.
UV LED is our specialty.